Partnered With Linked-Integration Group
7:30 AM on site at MDA 301
Techs: Andrew , Brandon , Josh.
Rack dressed and room cleaned. Finished USB power , uplink, and snaking. (Needs new monitor & face plate for touch screen in podium)
Finished at 2:30 pm.
Preparing for next room.